Compliance Statement- Hydraulic Hand Trolley
Keyword:Hydraulic Hand Trolley Time:2021-2-22 17:15:40
Compliance Statement- Hydraulic Hand Trolley
Our requirements | Your Offer |
Hydroid Hand Trolley with all standard and additional accessories as per specification below: 1. Specification: a. Model: To be mentioned b. Capacity(Minimum): 2Ton (2000kg) c. Maximum Fork Height (From ground to upper surface of work) : ≥190mm d. Minimum Fork Height (From ground to upper surface of work) : ≤80mm e. Fork Dimension: 1)Length: 1200-1400mm 2) Width: 150-160mm 3)Distance between Two forks: 500-540mm(Centre to Centre) 4) Thickness of fork sheet material: ≥3.5mm f. Size of roller : To be mentioned g. Steering Wheel Diameter: To be mentioned h. Wheel Material : To be mentioned
2. Country of origin, Assembly & Shipment: Group-B 3. Condition: a. All Standard attachment and accessories must be supplied with trollies. b. Trail run to be done by the supplier. c. 1 x Operator & 1 x Maintenance Manual in English Must be supplied with machine d. Must provided warranty for 01(one) year after acceptance. e. Bidder should submit original leaflet/Brochure with the offer | Hydroid Hand Trolley, RAMHOIST with all standard and additional accessories as per specification below: 4. Specification: a. Model: HPT02A b. Capacity(Minimum): 2Ton (2000kg) c. Maximum Fork Height (From ground to upper surface of work) : ≥ 230 mm d. Minimum Fork Height (From ground to upper surface of work) : ≤ 80 mm e. Fork Dimension: 1)Length: 1220mm 2) Width: 150 mm 3)Distance between Two forks: 550mm (Centre to Centre) 4) Thickness of fork sheet material: ≥ 3.5 mm (actual is 3.75m) f. Size of roller : 550mm g. Steering Wheel Diameter: φ180*50 h. Wheel Material : Nylon wheel 2. Country of origin, Assembly & Shipment: China
3. Condition: a. All Standard attachment and accessories must be supplied with trollies. ok b. Trail run to be done by the supplier. ? c. 1 x Operator & 1 x Maintenance Manual in English Must be supplied with machine ok d. Must provided warranty for 01(one) year after acceptance. ok e. Bidder should submit original leaflet/Brochure with the offer ? |