Inquiry about double track power trolley SGTC-200 + SGTC-300 from Singapore
Keyword:double track power trolley Time:2021-8-6 16:03:35
Subject: | RFQ-436UMN-AC1-Hoist Trolley RE: RFQ-436UMN-AC1-Hoist Trolley |
Date: | Tue, Aug 30, 2016 2:56 am |
To: |
Hi Mr Yang,
I would like to enquire about the cost of SGTC-200 and SGTC-300. Also how long will it take to ship to
Warmest Regards,
Julien Li
Mechanical Engineer
9/1
Hi,
Just to clarify:
SGTC-200
Qty 1
SGTC-300
Qty 1
9/1
Dear Julien Li
Thanks for the inquiry of double track power trolley:
SGTC-200: 500
SGTC-300: 550
The price is based on CFR Singapore.
Delivery time: 15 days
Shipping time: 7 days
So ETA Singapore: 22 days
Best regards
Yang
9/4
Hi Mr Yang,
I would like to enquire about the cost of SGTC-200 and SGTC-300. Also how long will it take to ship to
SGTC-200
Qty 1
SGTC-300
Qty 1
Warmest Regards,
Julien Li
9/4
Dear Julien Li
I sent below email via xhosits@outlook.com on 1/9 and I assume you haven’t received:
Thanks for the inquiry of double track power trolley:
SGTC-200: 500
SGTC-300: 550
The price is based on CFR Singapore.
Delivery time: 15 days
Shipping time: 7 days
So ETA Singapore: 22 days
Best regards
Yang
9/4
Dear Julien Li
Pls give me a confirmation if you received.
Thanks and best regards
Yang
9/4
Hi Mr Yang,
I have received it your email. Thanks!
9/7
Dear Julien Li
Pls contact me if any question.
Thanks and best regards
Yang
9/19
Hi Xin Hua,
Does the price include the motor?
Can I have a clearer design drawing for SGTC-300. The one on your website is not clear enough for me to design my system.
9/19
Dear Julien Li
Yes, it includes motor.
Attached is same as website listed, we don’t have any other drawing, may I know which parts you want to know then we will work accordingly.
Thanks and best regards
Yang