​Installation and foundation construction of electronic floor scales

Keyword:electronic floor scales   Time:2019-11-12 9:55:14

Installation and foundation construction of electronic floor scales

 The construction position of the electronic floor scale foundation should be good drainage channel, and the installation position should not be lower than the surrounding area, otherwise it will cause water accumulation when it rains due to the low terrain, which will flood the floor scale and damage the sensor. For shallow foundation pit should set drainage channel.

 The installation of electronic scale should first have a more suitable, spacious  site, and should ensure that the foundation has a larger bearing capacity. Bearing capacity requirements on the foundation: according to different areas, different conditions of construction, the bearing capacity must be greater than the maximum load may appear in the process of measurement.

 In the process of foundation construction, it is better to have several key bearing structures in an overall way. In general, two key bearing structures can be built on a block of concrete foundation. Under the condition of bearing capacity of each foundation, it is absolutely impossible to have a single subsidence change.

 The concrete foundation must be poured, and the foundation must be excavated below the local frozen soil line. During the construction, the concrete mark should be guaranteed, the embedded parts should be poured to ensure such dimensions as levelness and position, and the embedded parts should not be shifted when pouring the concrete. After the foundation casting is completed, it should be maintained according to the civil code, and only after the concrete reaches the design strength index can the floor scale be installed.

 The electronic floor scale must pour the concrete foundation, which must be excavated below the local frozen soil line. During the construction, the concrete mark number should be guaranteed, and the embedded parts should be poured to ensure such dimensions as levelness and position, and the embedded  parts should not shift when pouring the concrete. After the foundation casting is completed, it should be maintained according to the civil code, and only after the concrete reaches the design strength index can the floor scale be installed.

 If you want to shorten the maintenance period, allow the construction under the guidance of professional and technical personnel to add "early strength  agent" and other measures. In case of lightning, you should set up a ground pile according to local conditions and ensure that the ground resistance is less than 4 ohm.

 The construction position of the foundation should have a good drainage channel, and the installation position should not be lower than the surrounding area, otherwise it will cause water accumulation when it rains due to the low terrain, flood the scale and damage the sensor. For shallow foundation pit should set drainage channel. The other two ends must have enough length of straight road for the car weighing platform, two ends straight to at least equal to the length of weighing platform.

 In the process of foundation construction, it is better to have several key bearing structures in an overall way. In general, two key bearing structures can be built on a block of concrete foundation. Under the condition of bearing capacity of each foundation, it is absolutely impossible to have a single subsidence change.