Full electric rider pallet stacker 1000KG 3meter stacking forklift price 1 year warranty

Keyword:Electric Pallet Stackers   Time:2019-10-27 22:47:33

Regular Inspection and Maintenance of Electric pallet stacker
 I.  Maintenance of Electric Pallet stacker Motor     

 1.  The inspection and maintenance of the motor should be carried out under the condition of power failure.            

 2.  Check the connection of the motor outlet line is correct.            

 3.  Measuring the Cold-state insulation resistance of motors with 250 V Eurometer every three months, the resistance value should be greater than 0.5M. If the resistance value is less than 0.5M, drying treatment should be carried out.            

 4.  Check the brush wear every three months.            

 5.  Check whether the commutation tablets are clean and whether the brush slides freely in the brush box.            

 6.  Check whether all fasteners are fastened.            

 7.  It is recommended to do the overall maintenance of the electric pallet stacker motor once a year.            

 II.  Maintenance of Electric Pallet stacker Motor           
 1.  Batteries should be fully charged before they are put into use. Using undercharged batteries will reduce the service life of batteries.            

 2.  Batteries should avoid overcharge and over discharge as far as possible. Overcharge and over discharge of batteries will seriously affect the performance and life of batteries.             

 3. The liquid plug and gas cap of the battery should be kept clean. When  charging, they should be removed or opened. When charging, they should be installed or closed. Battery surface, connection wire and screw should be kept clean and dry.           
 After charging, check the battery level and add distilled water in time to maintain  the liquid level.           
 After the battery is used, it should be charged in time. The storage time of batteries in electric stack elevator generally does not exceed 24 hours. Keep good ventilation while charging, and prohibit fireworks.           
 2.  Rehabilitation          
 Daily maintenance: should be implemented once a day, the first text is to retain the body oral clean, the battery oral treatment clean, check whether the power cord is strong, whether the chain is loose or not normal.           
 Level 1 maintenance: once a week, besides the daily maintenance text, the text should focus on checking whether the employment situation of each component is normal, whether the fasteners are loose, whether the chain is suitable for tightening, whether the chain joint pin can bend and twist, whether the left and right movement of the internal and external portal frame is normal, whether the hydraulic joint can leak, whether the machine department. Does the door have abnormal wear and tear, and does the electrical department have abnormal temperature rise and sparks, etc. If abnormal signs of Electric pallet stacker are detected, real-time mediation and elimination should be carried out.             

 Secondary maintenance: It should be carried out as scheduled and all inspections should be carried out according to the conditions.           
 Above is only a general understanding, the overall employment is still to rectify your own situation, at the same time, once the exception occurs to be handled  in real time, can not delay time. At the same time, the pursuit of dedicated repair units, such as the implementation of repair, in a situation where I am not very focused, can not impulsively self-    repair.

Professional Manufacturer of Electric Pallet Stackers.jpg

Ramhoist News
  • No information
Ramhoist FAQ